Abstract:
                                      This  paper  discussed  the  result  of  soft  ground  improvement  of  an  expressway    located  in  Pearl River  delta  and  its  foundation  was  treated  by  preloading  combined  with  packed  drain  of  a  diameter  of  7  cm.  Testing  and  monitoring  results  showed  that  the  adopted  method  of  ground  treatment  was  very  effective,  so  the  preloading  time  when  degree  of  consolidation  reach  80%  was  reduced  by  1/3 as compared  with  the  design  anticipation.  Moreover,  appropriate  decrease  of  packed  drain  spacing  was  useful  to  the  pore  pressure  dissipation  and  soil  consolidation.  Packed  drains  also  have  a  vertical  reinforcement  and  anti  slide  effect  besides  the  drainage.  Soil  shear  strength  has  a  significant  decrease  due  to  disturbance  after  construction  of  the  packed  drains,  which  should  be  seriously  considered  for  practice  technicians  and  academic  authorities.