Abstract:
                                      Beilun  Thermal  Power  Plant  ash  dam  is  located  at  very  soft  foundation.  In  order  to    ensure    the  stability  and  security  during  construction  and  after  completion,  the    determination    of  construction  control  parameters  such  as  loading  velocity,  settling  time,    loading    safety  control  standard  influencing  directly  the  construction  period  and  quality  of  the  project  is  most  improtant.  On  this  account,  this  paper  described  the  analyses  and    calculation    of  the  parameters,  also  verifications  were  made  by  measured  data.