Abstract:
                                      Establishing an overall working system of flood control engineering schemes is the target of the strategic adjustment of the flood control and disaster reduction system in China. Non  engineering measures are the pivotal aspect of the new overall system. After reviewing the processes of non  engineering measures, and analyzing the universalities and particularities of the implementation of non  engineering measures, main points of non  engineering measures are discussed considering the practical situations in China.